Construction of a Water Treatment Plant at the TUD-Monte Grande Water System

3 Documents in Project

Summary

SCH Number
2008052100
Lead Agency
Tuolumne Utilities District
Document Title
Construction of a Water Treatment Plant at the TUD-Monte Grande Water System
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2012
Present Land Use
Residential, Estate Residential, Rural Residential / R-1, RE-1, RE-2, RE-5, O / LDR, ER, HR, RR
Document Description
The Tuolumne Utilities District - Monte Grande Water System (TUD) proposes to construct a 350 gpm package plant water treatment plant at the existing Monte Grande water treatment plant. TUD completed construction of related project components in 2008, including a 520,000 gallon tank and approximately 4,500 feet of pipeline connecting the Monte Grande system with the Matt Dillon/Curtis Creek water system.

Contact Information

Name
Kelly Klyn
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Cross Streets
Soulsbyville Road, Black Oak Road, Overlook Trail, Curtis Circle, Draper Mine Road
Zip
95372
State Highways
108
Railways
Sierra Railroad
Schools
Soulsbyville Elementary
Waterways
Curtis Creek
Township
2N
Range
15E
Section
36
Base
MDB&M
Other Location Info
City/Nearest Community: Soulsbyville

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print