Amendment of Lease

5 Documents in Project

Summary

SCH Number
2008051050
Lead Agency
Orange County Municipal Water District
Document Title
Amendment of Lease
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2009
Document Description
The Applicant proposes to divert the flow of San Juan Creek by pumping brackish groundwater and ocean water from under the ocean within the extension of the alluvial channel associated with San Juan Creek. The Dana Point Ocean Desalination Project, Phase 3 Extended Pumping and Pilot Plant Testing is a continuation of feasibility testing associated with the 2006 construction of a fully buried 12 inch diameter, 350 ft long test slant well on Doheny State Beach. Long term testing is needed to more thoroughly establish water quality parameters and to establish full scale desalting process design. In addition to measuring water quality, the Phase 3 testing will provide information to refine the existing ground water model and to evaluate the Reverse Osmosis process. The testing work will also provide information on the feasibility of using subsurface intakes to avoid marine organism entertainment and impingment impacts associated with conventional open intakes. The Applicant has performed scientific studies that predict the proposed project will not have a significant effect on fish and wildlife resources. However, per recommendation by the Dept., the Applicant submitted a Streambed Alteration Agreement Notification in the interest of opening a file for tracking and monitoring the effects of the test pumping project and for subsequent use in developing appropriate mitigantion measures should the full scale ocean desalination project be implemented. (SAA# 1600-2008-0212-R5)

Contact Information

Name
Richard Bell
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
25300 Dana Point Harbor Drive
Zip
92629
State Highways
1 (Pacific Coast Highway)
Schools
St. Edward School
Waterways
Pacific Ocean
Township
8S
Range
8W

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No