Port of Hueneme Navigation Deepening Project
2 Documents in Project
Summary
SCH Number
2008041047
Lead Agency
Oxnard Harbor District
Document Title
Port of Hueneme Navigation Deepening Project
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2016
Present Land Use
The project site is an artificial harbor owned by the Oxnard Harbor District and the U.S. Navy.
Document Description
The US. Army Corps of Engineers, LA District and the Oxnard Harbor District propose to deepen the Port of Hueneme Harbor's the main approach channel, entrance channel, turn basin, channel A, and channel A berthing areas. Under the Recommended Plan, the Main Approach Channel would be dredged to -13.2 m MLLW, and the Entrance Channel, Turn Basin, Channel A, and Berthing Area would be dredged to -12.2 m MLLW. Approximately 485,000 cubic meter of material would be dredged over a period of 3.5 months. Dredged material will be placed at Hueneme Beach for beach replenishment.
Contact Information
Name
John Demers
Agency Name
Oxnard Harbor District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Port Hueneme
Counties
Ventura
Cross Streets
Shipside Road and Pleasant Valley Road
Zip
93041
Total Acres
70
State Highways
34 (Saviers Road), 1 (PCH)
Schools
Hueneme ES and HS, Richard Baird
Waterways
Pacific Ocean, Channel Islands Harbor, Ormond Wetlands, Hueneme Lagoon
Notice of Determination
Approving Agency
Oxnard Harbor Distrit
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.