Lombard Crossings Industrial Park Warehouses

5 Documents in Project

Summary

SCH Number
2008012115
Lead Agency
City of American Canyon
Document Title
Lombard Crossings Industrial Park Warehouses
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2013
Document Description
The project is limited to: 1) installing a temporary double rail car bridge over North Slough to provide temporary site access until the permanent bridge can be completed; 2) installing a permanent clear-span bridge over North Slough, on-site wetland mitigation and riparian enhancement; 3) two new wetland basins over 1.28 acres will be excavated to an ~depth of 24-inches directly north of North Slough within the existing floodplain; and 4) enhancement of riparian canopy habitat along North Slough within the project area includes planting native trees and understory vegetation. The CA Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0249-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, SDG Lombard, LLC, as represented by Neil Thompson.

Contact Information

Name
Suzanne Gilmore
Agency Name
CA Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
American Canyon
Counties
Napa
Cross Streets
Northeast corner of American Canyon Rd and Hwy 29
Zip
94503
Parcel #
058-530-001, 010
State Highways
29
Railways
UPRR
Airports
Napa County Airport
Waterways
Napa River, San Pablo Bay
Township
4N
Range
4W
Section
13

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print