State Route 140 Ferguson Slide Rock Shed Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-078-04 (ITP) Major Amendment No. 1)

14 Documents in Project

Summary

SCH Number
2008011118
Lead Agency
California Department of Transportation, District 6
Document Title
State Route 140 Ferguson Slide Rock Shed Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-078-04 (ITP) Major Amendment No. 1)
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2016
Document Description
Project, as approved by CDFW on Dec. 18, 2015 involves the construction of a 700-foot long rock shed along the existing alignment of SR 140 to reestablish two-lane traffic in an area previously impacted by a series of major rockslides in spring 2006. The project is expected to result in incidental take of limestone salamander (hydromantes brunus) (Covered Species), which is designated as a threatened species under the CESA. Major Amendment No. 1 authorizes changes tot eh project description to icnldue geotechnical drilling activities; increasing the amount of Covered Species habitat disturbance; expands the take minimization measures by adding specific measures to geotechnical drilling activities; and adjusts the required submission date of the Vegetation Restoration Plan. As amended, the project will result in impacts up to approx. 3.04 acres of Covered Species habitat including 1.32 acres of permanent impacts. This ITP amendment does result in a small change to the project footprint and the amount of impacted Covered Species habitat.

Contact Information

Name
Reagen O'Leary
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency

Location

Counties
Mariposa
Cross Streets
SR 140
State Highways
SR 140
Waterways
Merced River
Other Location Info
City/Nearest Community: El Portal

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes