Recycled Water System Pressurization and Expansion Project

6 Documents in Project

Summary

SCH Number
2008011108
Lead Agency
Eastern Municipal Water District
Document Title
Recycled Water System Pressurization and Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2009
Document Description
The Recycled Water System Pressurization and Expansion Project will encourage and expand opportunities for recycled water use. The project is made up of 3 main components: 1) The Tank Project. Three recycled water storage tanks would be constructed to create pressure zones. These tanks would be strategically located to provide reliable recycled water service to the growing urban landscape market. The tanks would also stabilize pressure zones and increase operational flexibility. 2) The Hemet Citrus In-Lieu Project. This project would include a series of up to 36" diameter pipelines and a 7,000 GPM station at the Alessandro Ponds to deliver recycled water to citrus farmers in Hemet. The construction of this facility would allow farmers to utilize recycled water in-lieu of groundwater and reserve capacity in the groundwater basin for other uses. 3) Pond Pump Stations. This project would include the construction of 3,000 GPM pump stations at two existing recycled water storage facilities. This would allow stored recycled water to be used at peak periods to increase reliability and operational flexibility.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Hemet, San Jacinto
Counties
Riverside
State Highways
74 & 79
Waterways
San Jacinto River, Salt Creek
Base
SBB&M

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print