Amend Closure Plan for Martin Metal Finishing, Inc./Chemical Technology Labs, Inc.
2 Documents in Project
Summary
SCH Number
2008011088
Lead Agency
Department of Toxic Substances Control
Document Title
Amend Closure Plan for Martin Metal Finishing, Inc./Chemical Technology Labs, Inc.
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2009
Document Description
This project consists of sampling soil, concrete and ground water (at existing wells) and decontamination but contains contingencies for: (1) removal of any concrete which cannot be decontaminated to meet the closure performance standards; (2) limited excavation of contaminated soil; or (3) the installation of a SVE as necessary to meet the closure performance standards. Whether the SVE and the excavation activities will be necessary will depend ont he degree of contamination encountered during the closure sampling. The project decontamination, sampling and contingent soil and concrete cleanup or removal is associated with the closure of the three hazardous waste management units.
Contact Information
Name
Richard Allen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lynwood
Counties
Los Angeles
Cross Streets
Alameda and Dixon
Zip
90262
Total Acres
9.5
Parcel #
6169017004
State Highways
110
Railways
UPRR
Airports
LAX
Schools
Ralph Bunch Middle School
Waterways
Los Angeles River
Township
3S
Range
13W
Section
11
Base
SBB&M
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes