Ruxton Avenue Channel Conversion Project (SAA #1600-2007-0488-R5)

3 Documents in Project

Summary

SCH Number
2007121078
Lead Agency
San Diego County
Document Title
Ruxton Avenue Channel Conversion Project (SAA #1600-2007-0488-R5)
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2008
Present Land Use
Zoning: RS 7 and S80 General Plan: (6) Residential and (22) Public/Semi Public Lands
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2007-0488-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, County of San Diego, Department of Public Works. The applicant proposes to alter the stream to convert approximately 450 feet of concrete channel to an earthen channel, remove the existing 170-foot-long double 58 inch by 36 inch CMPA culvert under Ruxton Avenue and replace it with a 67-foot-long three-box culvert, leaving the remaining 103 feet open, widen the formerly-concrete-lined channel, and revegetate the resulting channel with native species. In addition, two rip-rap energy dissipaters will be added along the Jamacha Boulevard portion of the channel where storm drain lines empty into the channel, and a third rip-rap energy dissipater will be added near the southern terminus of the project where a storm drain empties into the channel.

Contact Information

Name
Kelly Fisher
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Jamacha Boulevard and Ruxton Avenue
Total Acres
1.73
State Highways
125
Township
17S
Range
1W
Section
0
Other Location Info
City/Community: Spring Valley (unincorporated)

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.