North Shafter Wastewater Project
3 Documents in Project
Summary
SCH Number
2007101126
Lead Agency
City of Shafter
Document Title
North Shafter Wastewater Project
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2009
Document Description
Project will expand the City's wastewater collection system into an area of the City is no currently served by the sewer systems and will replace the old septic tank systems, and eliminate the frequent raw sewage back-ups and exposure of residents to potential pollution problems. The Project involves Construction of ~12,450 linear ft of a new 8 inch sewer line, ~200 4 inch sewer laterals extending to the property lines at all existing developed parcels in the Project area, and ~12 sewer wyes with plugs for future connection to the remaining undeveloped lots within the Project area.
Contact Information
Name
Michelle L. Jones
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Bakersfield, Shafter, Wasco
Counties
Kern
Cross Streets
Bounded by Hwy 43 (east), Park Ln and Mettler Ave (west), Tulare Ave (south), Mayer Ave (north)
Zip
93263
Total Acres
~ 72
Parcel #
Numerous
State Highways
43
Railways
BNSF
Schools
Redwood, Sequoia, Richland, Shafter HS
Township
28S
Range
25E
Section
4, 9
Base
MDB&M
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.