Antelope Canal Maintenance Project
2 Documents in Project
Summary
SCH Number
2007092100
Lead Agency
Placer County Water Agency
Document Title
Antelope Canal Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2007
Present Land Use
The maintenance project area is surrounded by undeveloped lands and is characterized by annual grassland and oak woodland. The project area occurs within the future Clover Valley subdivision. The project area is zoned OA (Open Space/Conservation) and designated as R-A (Open Space/Conservation) (City of Rocklin General Plan, 2005).
Document Description
The proposed maintenance project involves placing gunite (concrete material) in ~2,000 feet of the earthen Antelope Canal. The canal will be dry during the late fall construction period. To the extent possible, removal and disturbance of native trees along the canal corridor would be avoided. All construction activities would be confined to the existing easement and existing access roads (including material stockpiling and vehicle parking). The total anticipated disturbance would not exceed 1.0 acre.
Contact Information
Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Rocklin
Counties
Placer
State Highways
I-80
Railways
Union Pacific Railroad
Schools
Valley View and Breen ES; Rocklin HS; Granite Oaks MS
Waterways
Clover Valley Creek and Antelope Creek
Township
11N
Range
7E
Section
6
Base
Rocklin
Notice of Determination
Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.