Microgy Bar 20 Gas Pipeline, Agreement No. 2008-0197-R4

4 Documents in Project

Summary

SCH Number
2007091073
Lead Agency
San Joaquin Valley Air Pollution Control District
Document Title
Microgy Bar 20 Gas Pipeline, Agreement No. 2008-0197-R4
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2009
Present Land Use
AE-20 (Exclusive Agriculture 20-Acre Minimum)
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Microgy Bar 20 Gas Pipeline. The County of Fresno has approved the installation and operation of an anaerobic digester facility with a maximum height of sixty feet at the Shehadey Dairy. The anaerobic digester will collect and digest cow manure from the dairy and import non-hazardous agricultural waste materials to produce biogas. The biogas will then be piped by an approximately 5.5 mile underground pipeline that will extend from the Shehadey Dairy to an existing PG&E pipeline. The pipeline will be routed underneath the San Joaquin River.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Kerman
Counties
Fresno
Cross Streets
24387 Whites Bridge Road (State Route 180)
Zip
93630
Total Acres
482
Township
13S
Range
16E
Section
5
Base
MDB&M

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print