Boulder Creek Interceptor Sewer Project

4 Documents in Project

Summary

SCH Number
2007082146
Lead Agency
City of Redding
Document Title
Boulder Creek Interceptor Sewer Project
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2007
Present Land Use
Zoning includes OS, RM (9 and 10 units/acre), PF, HC, GC. General Plan Designation: Greenway, Residential, Heavy Commercial, General Commercial, and Public Facility.
Document Description
The project will replace the Boulder Creek interceptor sewer line using trenchless and open trench construction techniques. The existing line does not have sufficient capacity to convey the current peak wet-weather flows and cannot accommodate any additional flow from future construction in the drainage basin. The project proposes to increase the capacity of the existing pipeline from between 6 and 24 inches to between 8 and 28 inches in diameter.

Contact Information

Name
Jonathan Oldham
Agency Name
City of Redding
Contact Types
Lead/Public Agency

Location

Cities
Redding
Counties
Shasta
Cross Streets
Highway 273, I-5, Churn Creek Road
Zip
96002, 003
Parcel #
Various
State Highways
299, 273, I-5
Railways
UPRR
Schools
Boulder Creek ES
Waterways
Boulder Creek, Churn Creek
Township
32N
Range
4&5W
Section
Variou
Base
MDB&M

Notice of Determination

Approving Agency
City of Redding
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print