6th Street Viaduct Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2015-0034-R5 - Revision 2).
4 Documents in Project
Summary
SCH Number
2007081005
Lead Agency
City of Los Angeles
Document Title
6th Street Viaduct Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2015-0034-R5 - Revision 2).
Document Type
NOD - Notice of Determination
Received
Posted
8/5/2015
Present Land Use
PLU: developed, heavy-light industrial
Z: heavy industrial, public facilities, light industrial
GP: heavy industrial, public facilities, light industrial
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0034-R5 - Revision 2, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of Los Angeles.
The project is limited to the demolition and reconstruction of the 6th Street Viaduct between Mateo Street and Boyle Avenue. The purpose of the project is to replace the viaduct due to structural weakening from Alkali Silica Reaction. The 6th Street viaduct is currently 3500 ft long 55 ft, the new viaduct will use the existing 3500 ft long footprint and will vary between 85.5 ft wide to 100 ft wide.
Contact Information
Name
Kelly Schmoker
Agency Name
CDFW South Coast Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Mill St and east of southbound I-5
Zip
90033,12
State Highways
101, I-5
Railways
BN&SF, UPRR
Airports
No
Schools
SotoStES,BishopMoraSalesian,MetropolitanHS,ParaLosNinosChater
Waterways
Los Angeles River
Township
1S
Range
13W
Section
34
Base
SBB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.