Newport Executive Center
2 Documents in Project
Summary
SCH Number
2007071158
Lead Agency
City of Newport Beach
Document Title
Newport Executive Center
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2015
Present Land Use
The site is zoned as Business Park [SP-7(BP)] by the Specific Plan District 7 (Santa Ana Heights). The City's General Plan designations the proposed project parcels as General Commercial Office with a maximum floor area ratio of 0.50 (CO-G 0.50) which is intended to provide for administrative, professional, and medical offices with limited accessory retail and service uses.
Document Description
The project includes the construction of two, two-story medical office buildings totaling 64,000 square feet in gross floor area and a 324-space surface parking lot. The project site is approximately 4.1 acres and contains vacant land and two single-unit residences with associated outbuildings that will be demolished.
Contact Information
Name
Rosalinh Ung
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency
Phone
Location
Cities
Newport Beach
Counties
Orange
Cross Streets
Birch Street and Mesa Drive
Zip
92660
Total Acres
133,479
Parcel #
439-381-28, 30; 439-382-06, 07, 10, 26, 27
State Highways
SR-73, SR-55
Airports
John Wayne Airport
Schools
Newport Montessori
Waterways
Santa Ana Delhi Channel and Upper Newport Bay
Other Location Info
City/Nearest Community: Santa Ana Heights
Notice of Determination
Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.