Salt River Ecosystem Restoration Project EIR Addendum

15 Documents in Project

Summary

SCH Number
2007062030
Lead Agency
Humboldt County
Document Title
Salt River Ecosystem Restoration Project EIR Addendum
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2018
Present Land Use
PLU: Agricultural (mostly dairy) and forestry GP: Agricultural Exclusive, Agriculture Grazing, and Timber Production Z: Agricultural Exclusive, 60 acre minimum (AE-60), Timberland Production (TPZ), and Unclassified (U)
Document Description
Design modifications and project component additions to Phase 2 of the Salt River Ecosystem Restoration Project include an agricultural bridge, relocating a culvert crossing, and riparian planting areas. The minor changes remain consistent with the overall Salt River Ecosystem Restoration Project goals/objectives and do not result in substantial changes to the overall project design or function.

Contact Information

Name
Jill Demers
Agency Name
Humboldt County
Contact Types
Lead/Public Agency

Location

Cities
Ferndale
Counties
Humboldt
Zip
95536
Total Acres
1103
State Highways
101, SR 211, SR 36
Railways
No
Airports
No
Schools
No
Waterways
Eel River, Salt River, Williams, Francis, and Reas Creeks, Pacific Ocean
Township
2N,3N
Range
2,1W
Section
34,35
Other Location Info
Port Kenyon
Other Information
Sections con't: 36, 1, 2, 31

Notice of Determination

Approving Agency
Humboldt County Resource Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print