Rio Dell Wastewater Reuse Project

14 Documents in Project

Summary

SCH Number
2007062006
Lead Agency
City of Rio Dell
Document Title
Rio Dell Wastewater Reuse Project
Document Type
FIN - Final Document
Received
Present Land Use
General Plan Designation: Agriculture Exclusive, Agriculture Conservation, Agriculture Industrial, Timber Production and other similar designations.
Document Description
The City of Rio Dell is proposing a modification to the Rio Dell Wastewater Reuse Project. The alignment and methodology of the sewer transmission pipeline where it crosses the Eel River, northwest of the City of Rio Dell, is proposed to be modified. Rather than crossing the Eel River within the Southbound Highway 101 Bridge, the pipeline is proposed to cross underneath the Eel River using horizontal directional drilling techniques. This represents a minor change to the pipeline alignment of treated effluent reuse Option Reuse1A as evaluated in the 2008 Certified EIR. No other change to the Rio Dell Wastewater Reuse Project is proposed.

Contact Information

Name
Stephanie Beauchaine
Agency Name
City of Rio Dell
Contact Types
Lead/Public Agency

Location

Cities
Rio Dell
Counties
Humboldt
Cross Streets
Highway 101
Zip
95562
Parcel #
052-061-053, 205-111-039
State Highways
Hwy 101
Railways
No
Airports
No
Schools
Rio Dell E.S.
Waterways
Eel River
Township
2N
Range
1W
Section
36
Base
HB&M

Notice of Completion

Development Types
Waste Treatment:Other (Disinfected Secondary 23, 0.9 MGD)
Local Actions
utilities
Project Issues
Biological Resources, Hydrology/Water Quality, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print