Ione Fire Station
2 Documents in Project
Summary
SCH Number
2007042154
Lead Agency
City of Ione
Document Title
Ione Fire Station
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2007
Present Land Use
Vacant/ R-1b/ Residential Medium Density
Document Description
The proposed project would include the construction of a new fire station for the City of Ione. The station would be approx. 8,250 sq. ft. (110 feet wide by 75 feet deep). The building will be set back 44 feet from the sidewalk on Preston Ave. The front garage doors for the fire apparatus will face Preston Ave. and the rear doors will allow the fire apparatus to respond out onto Waterman Road or drive around the building for exit onto Preston Ave. The fire trucks and emergency medical vehicles would enter onto SR 104 for events and would return from an event and access the site from the Waterman Road entrance to avoid backing and potential traffic incidents on Preston Ave. Fire Station Warning Signs will be installed with a flashing light that will be turned on when responding to events. The Fire Station Warning Signs will be controlled by a timer/ switch. Public access will be provided via Preston Ave. or Waterman Road, which will avoid the need to put in a turning lane. The building and exterior materials will be compatible with the existing character of the surrounding neighborhood, which is primarily single family residential. Both the front and rear aprons will be cement and the front and rear parking areas will be surfaced with blacktop. The south side driveway will also be constructed of blacktop.
Contact Information
Name
David Young
Agency Name
City of Ione
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ione
Counties
Amador
Cross Streets
SR 104 and Waterman Road
Total Acres
0.4
State Highways
SR 104, SR 124
Railways
Ione and Eastern Railroad
Waterways
Sutter Creek and Mule Creek
Notice of Determination
Approving Agency
City of Ione
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.