Library and Courts Renovation Project

2 Documents in Project

Summary

SCH Number
2007042043
Lead Agency
Department of General Services (DGS)
Document Title
Library and Courts Renovation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2007
Present Land Use
Urban Development
Document Description
The proposed project consists of renovating the Library and Courts Building interior and exterior. While the building has already been upgraded to meet seismic safety standards, much of the building's infrastructure and some of its architectural design is deteriorating and in need of immediate repair. In addition, the building needs to be updated to comply with current safety and Americans with Disabilities Act access standards. The California Dept. of General Services is proposing to renovate the building to repair age-related damage that has occurred withn the past 80 years; re-establish some of the building's historical values lost during interior renovations in the 1950s and again in the 1970s; and extend the building's life by improving fire safety and life-safety compliance.

Contact Information

Name
Brian Wilkinson
Agency Name
California State Department of General Services - RESD
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Ninth Street, 10th Street, N Street, Capitol Mall
Zip
95814
Total Acres
3
State Highways
50
Railways
UPRR
Airports
Sacramento International
Waterways
Sacramento River

Notice of Determination

Approving Agency
California Department of General Services
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print