Fish Passage Enhancement to El Jaro Creek at Rancho San Julian
3 Documents in Project
Summary
SCH Number
2007041120
Lead Agency
Cachuma Operation and Maintenance Board
(COMB)
Document Title
Fish Passage Enhancement to El Jaro Creek at Rancho San Julian
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2007
Document Description
A steelhead/rainbow trout migration passage barrier exists near the San Julian Ranch on El Jaro Creek. The barrier is a concrete grade control structure immediately below the bridge that spans the width of the active channel and acts to preserve the integrity of the bridge. Steelhead/rainbow trout attempting to negotiate the obstacle during low to high flow conditions can become seriously injured or killed when they jump from the pool and land on the grade control structure above. The project will modify the structure to create a migration path for fish during low through high flow periods, by constructing nine step pools; 4 feet wide by 6 feet long, in the concrete apron under the bridge. Each pool will be designed to provide no more than an 8-inch vertical jump between pools and have a minimum depth of 2.5 feet within each of the nine pools.
Contact Information
Name
Tim Robinson
Agency Name
Cachuma Conservation Release Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lompoc
Counties
Santa Barbara
Cross Streets
Highway 1 / Star Route
Zip
93436
Parcel #
083-470-015
State Highways
1
Waterways
El Jaro Creek
Township
5N
Range
33W
Notice of Determination
Approving Agency
Cachuma Conservation Release Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes