Sterling Chateau Unit #5

2 Documents in Project

Summary

SCH Number
2007032078
Lead Agency
City of Vacaville
Document Title
Sterling Chateau Unit #5
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2007
Present Land Use
General Plan design for low density residential, zoning AG, Agriculture (when annexed) as holding zone until submittal of a development application.
Document Description
Proposal subdivide an 18.3 acre site into 78 lots ranging in size from 6,344 sf to 11,129 sf and including a proposal to construct 6 plans of homes ranging in size from approximately 2,000 sf to 3,760 sf with a mix of 4-two story and 2-one story floor plans. The property is located on the west side of Vanden Road, directly north of the Southtown project area and south of the existing Heritage Place neighborhood (APN 136-110-010). Required project actions include: (1) adoption of a Mitigated Negative Declaration; (2) zone change from AG to RL-6; (3) Vesting Tentative Map; (4) Planned Development; (5) Design Review of homes and development plan, and (6) Development Agreement. The project will include dedication and frontage improvements along Vanden Road and installation of a clear span pedestrian bridge over Alamo Channel.

Contact Information

Name
Deborah Faaborg
Agency Name
City of Vacaville
Contact Types
Lead/Public Agency

Location

Cities
Vacaville
Counties
Solano
Cross Streets
Vaden Road
Zip
95687
Total Acres
18.3
Parcel #
136-110-010
State Highways
80
Railways
South Pacific
Schools
Cambridge ES, Travis School District
Waterways
Alamo Drainage Channels and Irrigation Canals

Notice of Determination

Approving Agency
City Council of City of Vacaville
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print