Stream Alteration Agreement No. 2009-0139-R4 for the Water Treatment Plant Improvements

6 Documents in Project

Summary

SCH Number
2007031077
Lead Agency
Springville Public Utility District
Document Title
Stream Alteration Agreement No. 2009-0139-R4 for the Water Treatment Plant Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/30/2009
Document Description
The primary purpose of the Project is the installation of treatment process improvements at the District's existing water treatment plant. The construction of a 50 ft portion of the pipeline is expected to impact the bed, bank, channel, and riparian zone of the Tule River. The utility district will utilize a subterranean collector pipe installed underneath the riverbed to collect and divert water, in lieu of an above-ground structure that would utilize screens. A trench 4 ft deep by 3 ft wide will be dug to accommodate the installation of the pipeline. Excavated materials (~8 cy) plus additional construction materials will be used to recontour the bank. Excavation will remove ~50 ft (1,000 sf) of grasses, annual and perennial herbaceous plants and small shrubs within the riparian zone.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Tulare
Cross Streets
Highway 190
Zip
93265
Total Acres
< 5
Parcel #
284-150-007
State Highways
190
Waterways
Tule River, North Fork, Middle Fork
Township
21S
Range
29E
Section
1
Base
MDB&M
Other Location Info
City/Nearest Community: Springville

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes