Amendment of Lease

10 Documents in Project

Summary

SCH Number
2007021127
Lead Agency
Great Basin Air Pollution Control District
Document Title
Amendment of Lease
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2009
Present Land Use
General Plan: Natural Resources and State and Federal Lands Zoning: OS-40, Open Space Zone, 40-acre minimum lot size
Document Description
Authorize amendment of General Lease - Public Agency Use No. PRC 8079.9, effective June 1, 2009, for the construction, installation, operation, and monitoring of Channel Berm Dust Control Project associated with Phase VII of the Owens Lake Dust Control Project; to amend the authorized improvements, special provisions, and lease description; and to authorize two eighteen-inch-high, 800-foot-long earthen check berms, two access roads with riprap slopes, and two tubular barrier gates associated with the Phase VII Project as described in EIR SCH#2007021127.

Contact Information

Name
Paul D. Thayer
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
US Highway 395, State Highway 136, and State Highway 190
Parcel #
Covers portions of USGS 7.5 Minute Quads
State Highways
136 and 190
Schools
Olancha Elementary
Waterways
Owens River, Los Angeles Aqueduct
Other Location Info
Owens Lake

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print