Topock Upland in Situ Pilot Test, Aquifer Testing, Groundwater Well Maintenance and Well Decommissioning

2 Documents in Project

Summary

SCH Number
2007021035
Lead Agency
Department of Toxic Substances Control
Document Title
Topock Upland in Situ Pilot Test, Aquifer Testing, Groundwater Well Maintenance and Well Decommissioning
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2007
Present Land Use
Open Space within the United States Fish and Wildlife Services
Document Description
DTSC is currently overseeing investigative and remedial activities at the PG&E Topock Compressor Station. Historical operations at the project site involved the use of chromium in the compressor station cooling water. Subsequent discharge of the cooling water resulted in chromium entering the groundwater aquifer. PG&E has submitted the following three work plans to DTSC for approval: 1) In-situ Hexavalent Chromium Reduction Pilot Test Work Plan - Upland Plume Treatment (Arcadis 2006) 2) Work Plan for Hydraulic Testing Bedrock Wells (CH2M HILL 2006g and CH2M HILL 2006h) 3) Well PGE-6 Revised Decommissioning Work Plan (CH2M HILL 2006f)

Contact Information

Name
Aaron Yue
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Needles
Counties
San Bernardino
Cross Streets
Park Moabi and I-40
Total Acres
0.5
Railways
BNSF
Waterways
Colorado River
Other Location Info
City/Nearest Community: Topock, Arizona

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print