Apple Computer 69-kV Electric Distribution Project

2 Documents in Project

Summary

SCH Number
2007012116
Lead Agency
Sacramento Municipal Utility District
Document Title
Apple Computer 69-kV Electric Distribution Project
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2007
Present Land Use
APNs: 119-0120-013, 128 GP: Public/Quasi-Public Z: Agriculture with 80-acre minimum (AG-80) APNs: 119-0120-036, 039 GP: Public/Quasi-Public Z: Light Industrial (M-1)
Document Description
SMUD proposes to construct and operate a 69-kV subtransmission power line that is required to serve a dedicated substation at Apple Computer, Inc. The proposed overhead subtransmission line would be 1.1-miles-long. It would upgrade an existing 12-kV line. Approximately 0.75 mile of the existing 12-kV line would be upgraded to a 69-kV configuration with a 12-kV underbuild, and ~0.35 mile of the existing 12-kV line would be uprgraded to a new 69-kV line without an underbuild.

Contact Information

Name
Kim Crawford
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
~ 935' north Laguna Blvd, extending from ~ 2,200' west Laguna Main St to ~ 1,200' E Dwight Rd
Zip
95758
Total Acres
2
Parcel #
119-0120-013, 036, 039, 0128
State Highways
I-5
Railways
Yes
Airports
Borges-Clarksburg Airport in Cla
Schools
Yes
Waterways
Sacramento River and an unlined drainage canal
Township
7N
Range
5E
Section
29, 30
Base
MDBM

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes