City of Delano Arsenic Mitigation Project

5 Documents in Project

Summary

SCH Number
2007011055
Lead Agency
City of Delano
Document Title
City of Delano Arsenic Mitigation Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2008
Present Land Use
Various, primarily Community Facilities Land Use designation and zoning.
Document Description
The project will consist of either: (1) construction of arsenic removal facilities for the existing water wells, or (2) drilling of wells at or near their existing locations. Funding of the project will be using a combination of City water funds and a possible loan from the Safe Drinking Water State Revolving Fund. The project will consist of minor demolition and grading at the existing or proposed well sites, installation of piping, pressure vessels, chemical storage, chemical feed pumps, electrical modifications, landscaping, well casing, and related facilities. Acquisition of additional land at two well sites may be required.

Contact Information

Name
Mike McCabe
Agency Name
City of Delano
Contact Types
Lead/Public Agency

Location

Cities
Delano
Counties
Kern
Cross Streets
State Routes 99 and 155
Zip
93215
Parcel #
Numerous
State Highways
SR-99, SR-155
Railways
UPRR
Airports
Delano Municipal
Schools
Numerous
Waterways
Friant Kern Canal
Township
25S
Range
25E
Section
Variou
Base
MDBM

Notice of Determination

Approving Agency
City of Delano
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print