Boardman Canal Pipeline Maintenance Project
2 Documents in Project
Summary
SCH Number
2006122051
Lead Agency
Placer County Water Agency
Document Title
Boardman Canal Pipeline Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2007
Present Land Use
Rural residential and agriculture.
GP: Rural Residential
Z: RA-B-X (4.6-acre minimum): Residential Agricultural Building Site
Document Description
PCWA is proposing to repair a 100-foot-long segment of the Boardman Canal system. This proposed maintenance project involves installing an approximately 100-foot-long segment of a new 30-inch pipeline, removing the existing Boardman Canal Pipeline, and guniting a 100-foot-long section of the Boardman Canal. PCWA is proposing to conduct this maintenance activity between June and November 2007. The maintenance work would require approximately four weeks.
Contact Information
Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency
Phone
Location
Counties
Placer
Cross Streets
Brennans Road
Parcel #
042-193-028
State Highways
I-80
Railways
UPRR
Waterways
Secret Ravine
Township
12N
Range
8E
Section
31
Base
Rocklin
Other Location Info
City/Nearest Community: Newcastle
Notice of Determination
Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.