22716 and 22706 Pacific Coast Hwy

2 Documents in Project

Summary

SCH Number
2006121065
Lead Agency
City of Malibu
Document Title
22716 and 22706 Pacific Coast Hwy
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2007
Present Land Use
Commercial Visitor Serving (CV-1)
Document Description
The proposed project at 22716 Pacific Coast Highway consists of the demolition of an existing 8,003 square foot vacant restaurant building (formerly Pierview/Malibu Cantina) and the construction of a new, 7,514 square foot restaurant. The new restaurant is proposed to be two stories in height and would include kitchens, dining rooms, bars/lounge areas, and outdoor patios. The structure is proposed to be connected to the proposed (adjacent) restaurant at 22706 Pacific Coast Highway by a landscaped outdoor deck. The proposed project at 22706 Pacific Coast Highway consists of the demolition of an existing 7,732 square foot vacant restaurant building (formerly Windsail Restaurant) and the construction of a new, 5,904 square foot restaurant. The new restaurant is proposed to be a single-story structure and would contain kitchens, bar/lounge areas, dining rooms, and indoor/outdoor seating.

Contact Information

Name
Stacey Rice
Agency Name
City of Malibu
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Pacific Coast Highway
Zip
90265
State Highways
PCH
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Malibu
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print