Redwood Creek Emergency Bridge Repair Project
Summary
SCH Number
2006118017
Public Agency
Fish & Game #3
Document Title
Redwood Creek Emergency Bridge Repair Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/2/2006
Document Description
The proposed project involves the placement of concrete and rip rap at the base of two bridge abutments adjacent to the streambed and banks of Redwood Creek. The applicant proposes to place the condrete in "scour pockets" while the associated rip rap will extend approximately 30 linear feet on the eastern abutment in an "L" shape, covering approximately 2/3 of the abutment. Rip rap will also be placed along the upstream end of the western abutment and will extend approximately 20 linear feet upstream. In order to facilitate these activities, both sides of the stream channel will need to be de-watered approximately 16 feet upstream and 5 feet downstream with an open channel maintained in the middle of the streambed. Cofferdams will be utilized for de-watering and will remain in place for up to 12 days in order to allow the poured concrete to cure properly. Issuance of a Streambed Alteration Agreement Number 1600-2006-0748-3 is pursuant to Fish and Game Code Section 1602.
Contact Information
Name
Jeremy Sarrow
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency
Phone
Location
Counties
Marin
Other Location Info
Muir Woods National Park
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301(d)
Reasons for Exemption
Existing facilities.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.