Permitting and operation of Wells 44 & 52, onsite chlorine injection systems, and ion exchange treatment facility
5 Documents in Project
Summary
SCH Number
2006101159
Lead Agency
City of Ontario
Document Title
Permitting and operation of Wells 44 & 52, onsite chlorine injection systems, and ion exchange treatment facility
Document Type
NOD - Notice of Determination
Received
Posted
5/27/2009
Document Description
The City of Ontario is proposing to construct and operate 2 groundwater production wells (Wells 44 & 52), associated chlorine injections systems, and an ion exchange treatment facility as part of the Chino Basin Dry-Year Yield Program. Each well site consists of a deep-well vertical turbine pump, electrical motors, on-site chlorine generation equipment including salt and sodium hypochlorite storage tanks, and associated appurtenances. Once installed and operational, the wells are anticipated to yield ~2,500 gpm to the system. The ion exchange facility will be sized to treat from Wells 44 & 52 with a total flow of 5,000 gpm.
Contact Information
Name
Sean McCarthy
Agency Name
Health Services
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ontario
Counties
San Bernardino
Cross Streets
4th St to the north,Grove Ave to the east, I St to the south, & Cucamonga Avenue to west
Zip
91761
Notice of Determination
Approving Agency
Health Services
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.