Reservoir 1092-2

3 Documents in Project

Summary

SCH Number
2006101003
Lead Agency
Coachella Valley Water District
Document Title
Reservoir 1092-2
Document Type
NOD - Notice of Determination
Received
Posted
11/27/2006
Present Land Use
Government Services GP: Government Services
Document Description
The Reservoir 1092-2 project proposes the construction of a 2.5-million gallon, steel water reservoir on the same 5-acre parcel of existing 1.0-million-gallon Reservoir 1092-1 that was constructed in 1964. The project includes shallow excavation to construct a concrete ring wall and all appurtenances necessary to connect the reservoir to the existing domestic water system on-site. The purpose of the Reservoir 1092-2 project is to provide additional water storage for increasing domestic water and fire protection demands within the Sunrise and improvement District 11 Pressure Zones. This additional water storage reservoir will provide energy savings by alleviating the need to operate associated domestic water wells during peak electrical consumption periods. In addition, a second reservoir will allow removal of one reservoir from service for routine maintenance and repairs.

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
Diamond Drive / Marina Drive
Zip
92274
Total Acres
0.50
Parcel #
007-110-37-01
State Highways
86
Waterways
Salton Sea
Township
10S
Range
9E
Section
25
Base
SB
Other Location Info
City/Nearest Community: Salton City

Notice of Determination

Approving Agency
Board of Directors of the Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A