I-80 Across the Top, Bus/Carpool Lanes Project

10 Documents in Project

Summary

SCH Number
2006092057
Lead Agency
California Department of Transportation, District 3
Document Title
I-80 Across the Top, Bus/Carpool Lanes Project
Document Type
NOD - Notice of Determination
Received
Posted
4/29/2009
Document Description
The project will require the construction of 8 new 5 ft by 3.5 ft oblong columns (0.003 acres) within the Natomas East Main Drainage Canal (NEMDC), located just east of Northgate Boulevard, to support the proposed median lanes that will be built between the existing bridge crossing over the NEMDC. A natural stream, Steelhead Creek, is contained within the levees of the NEMDC. The proposed new columns will be installed in the NEMDC channel when it is dry, and no construction will occur within Steelhead Creek. A temporary bridge (for construction equipment access) will be used to cross Steelhead Creek. The temporary structure will be completely out of the creek, no work will occur in the creek, and no debris, soil or other fill material will be allowed in the creek.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Northgate Boulevard, I-80
State Highways
80
Railways
UPRR
Waterways
Steelhead Creek

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print