Streambed Alteration Agreement 1600-2004-0651-3 / THP 1-04-124 SCR

Summary

SCH Number
2006089030
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2004-0651-3 / THP 1-04-124 SCR
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2006
Document Description
The project is the construction of two rock-ford crossings of a watercourse in conjunction with THP 1-04-124 SCR. According to materials submitted with the notification: - construction will be supervised by the Registered Professional Forester - spoils will be end-hauled from the crossing sites - the road bed at the crossings will be constructed of 3"x5" or larger rock - the road surface will have a running surface of 1.5" drain rock - the western approach to Crossing 6 will be coated with 1.5" drain rock following completion of hauling critical dips will be installed by the latter of 5-days after hauling or October 15 - overflow facing will be with rock 2-feet in diameter or larger and, if smaller than 3-feet in diameter, keyed - 1 foot into the channel - if water is present during road construction, it will be diverted around the work site through a pipe - exposed soils will be straw mulched

Contact Information

Name
Robert W. Floerke
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location


Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A