Shasta Lake Master Wastewater System Plan Improvements (E 06-01)

3 Documents in Project

Summary

SCH Number
2006082035
Lead Agency
City of Shasta Lake
Document Title
Shasta Lake Master Wastewater System Plan Improvements (E 06-01)
Document Type
NEG - Negative Declaration
Received
Present Land Use
The majority of the project is located within existing utility easements and public right-of-way located within residential areas of the City. A portion of the property along Cascade Boulevard, south of Deer Creek Avenue and north of Pine Grove Avenue is located within vacant commercially-zoned property. A portion of the sewer line runs along Salt Creek from Pine Grove Avenue north to Red Bluff Street.
Document Description
The proposed project includes implementation of a portion of the City's Wastewater System Master Plan to improve capacity, reliability, and efficiency of the City's wastewater distribution system. 1. Cascade Blvd. Relief Sewer and Shasta St. Intertie: Includes paralleling the existing 8" sewer line with 15", 18", and 21" lines from a point generally north of Pine Grove Avenue, across APN 075-150-0050, north along Cascade Boulevard, a distance of approximately 2,100 feet. The Shasta Street Intertie includes a new 8" line generally east of Shasta Street, west of Cascade Boulevard, within the existing right-of-way of Bonneville Street. 2. Upper Salt Creek Trunk Sewer: Includes paralleling the existing 10" sewer line with 12", 15", 18", and 21" lines from a point generally north of Pine Grove Avenue, running along the west boundary of Salt Creek, east of Ostling Avenue, west of Cottage Avenue, north to Bonneville Street. 3. Washington Avenue Sewer: Includes replacement of an existing 8" sewer line with 12", 15", and 18" lines from a point generally north of Bonneville Street along the public right-of-way of Washington Avenue, north across Shasta Dam Boulevard to Front Street. The project continues with replacement of an existing 6" line with 8", 10", 12", and 15" lines from a point generally north of Front Street, south of Red Bluff Avenue, west of Mussel Shoals Avenue, and east of Grand River Avenue. The sewer would be located within the existing right-of-way of Washington Avenue, west along Chico Street to an existing drainage, then north to the alleyway between Washington Avenue and Grand River Avenue, west to Grand River Street and north to Red Bluff Street. 4. Front Street Sewer: Includes the replacement of an existing 6" sewer line located generally north of Shasta Dam Boulevard between Washington Avenue and Locust Avenue within the public right-of-way of Front Street.

Contact Information

Name
Carla L. Thompson
Agency Name
City of Shasta Lake
Contact Types
Lead/Public Agency

Location

Cities
Shasta Lake
Counties
Shasta
Cross Streets
Cascade Boulevard / Pine Grove Avenue / Shasta Dam Boulevard and Washington Avenue
Zip
96019
Total Acres
+/- 10
Parcel #
Various
State Highways
151
Railways
UPRR
Schools
Grand Oaks ES, Central Valley HS, Shasta Lake School
Waterways
Churn Creek, Salt Creek
Township
32N,
Range
4W
Section
6, 30,
Base
MDM
Other Information
Township: 33N Section: 31, 32

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), Department of Toxic Substances Control, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC), California Department of Transportation, District 2 (DOT), Department of Water Resources
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 2 (DOT), Department of Water Resources
Development Types
Waste Treatment:Other (Wastewater Distribution System Improvements)
Local Actions
Master Wastewater System Plan Implementation
Project Issues
Air Quality, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print