Gridley Wastewater Treatment Plant Expansion Project
4 Documents in Project
Summary
SCH Number
2006082006
Lead Agency
City of Gridley
Document Title
Gridley Wastewater Treatment Plant Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2006
Present Land Use
Industrial
Z: General Industrial
Document Description
The project involves installation of upgraded equipment to the City's existing wastewater treatment plant in an effort to process additional wastewater. The proposed project will result in an increase in the design capacity from a maximum dry weather flow of 1.05 million gallons per day (mgd) to 1.7 mgd. The increase in primary and secondary treatment capacity will be achieved by significantly increasing aeration in the aeration and polishing ponds, improving mixing in the aeration pond and replacing the existing headworks with a new facility. Hydraulic upgrades consisting of yard piping and inlet/outlet modifications will be performed to maintain the required minimum 2 feet of freeboard in all ponds at peak flows. The proposed modifications to the existing aeration systems will increase the wastewater treatment plant capacity and will reduce total suspended solids (TSS) and biochemical oxygen demand (BOD) concentrations in the effluent produced.
Contact Information
Name
Andrea Redamonti
Agency Name
City of Gridley
Contact Types
Lead/Public Agency
Phone
Location
Cities
Gridley
Counties
Butte
Cross Streets
E. Gridley Road
Parcel #
024-220-023
State Highways
Hwy. 99
Railways
UPRR
Waterways
Feather River
Township
17N
Range
3W
Section
3, 4
Notice of Determination
Approving Agency
Gridley City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.