Port of Long Beach Southeast Basin Vessel Emission Control Project

2 Documents in Project

Summary

SCH Number
2006081073
Lead Agency
Port of Long Beach
Document Title
Port of Long Beach Southeast Basin Vessel Emission Control Project
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2006
Present Land Use
GP: IP (Port Industrial)
Document Description
Metropolitan Stevedore Company proposes to construct an Advanced Maritime Emissions Control System (AMECS) for reducing at-berth emissions from vessels calling at their facility on Pier G, at Berths G212 and G214. Initial construction will include installation of an emission treatment unit and a fixed tower mounted near the wharf at Berth G212. The AMECS will be tested in a pilot study at Berth G212 to determine its effectiveness for reducing emissions and if successful, then expanded in a second phase to Berth G214. Further, the Port of Long Beach is evaluating potential future expansion of the system around the Southeast Basin, to include a total of two emission treatment units and eight fixed tower emission control systems, through a multi-phase build-out process.

Contact Information

Name
Heather Tomley
Agency Name
Port of Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
S. Pico Avenue and Harbor Plaza
Zip
90802
State Highways
710, CA-47
Railways
Alameda Corridor
Schools
Cesar Chavez ES and Edison ES
Waterways
Long Beach Harbor

Notice of Determination

Approving Agency
Long Beach Harbor Department Board of Harbor Commissioners
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print