Sunset Vistas/Theaker TM 5257RPL^3
2 Documents in Project
Summary
SCH Number
2006081060
Lead Agency
San Diego County
Document Title
Sunset Vistas/Theaker TM 5257RPL^3
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2007
Present Land Use
The site currently supports one single-family residence.
GP: Residential, maximum density of 1 du per 1, 2, 4 gross acres depending on the slope.
Z: A70 Use Regulation which allows for a minimum lot size of 1 acre.
Document Description
The project proposes a major subdivision of 9.3 gross acres into 8 residential lots ranging in size from 1.06 to 1.40 acres. Construction activities as a result of the subdivision will include: 8 housing pads with associated driveways, and fire clearing. Grading is proposed to be a balance cut and fill operation of 4,800 cubic yards. An existing house is to be removed on proposed Parcel 3. The project will take access off Hanson Lane, an existing publicly maintained road. The project will be served by the Ramona Fire Department CDF, Ramona Municipal Water District. Extension of sewer lines approximately 2000 ft along Hanson Lane will be required.
Contact Information
Name
Megan Hamilton
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Cross Streets
Ashley and Hanson Lane
Total Acres
9.3
Parcel #
284-032-17
State Highways
67
Schools
Ramona HS
Township
13S
Range
1E
Section
17
Other Location Info
City/Community: Ramona
Notice of Determination
Approving Agency
County of San Diego Department of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.