State Route 101 - Santa Maria Bridge Widening Project - Agreement 2009-0091-R4
5 Documents in Project
Summary
SCH Number
2006071039
Lead Agency
California Department of Transportation, District 5
Document Title
State Route 101 - Santa Maria Bridge Widening Project - Agreement 2009-0091-R4
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2009
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant. Caltrans proposes to widen the existing Santa Maria Bridge to accommodate one additional 12 ft northbound lane, one additional 12 ft southbound lane, a 12 ft Class 1 bicycle path on the southbound side and 10 ft shoulders. The proposed widening will extend the width of the bridges from 68 ft to 130 ft 10 inches, by filling the 36 ft median gap in between the existing bridges, and widening the structure 20 ft 5 inches to the west and 6 ft and 5 inches to the east. Work will be done over the river channel when water is present, but no work will be done in the wetted portion of the channel. There will be ~12,474 sf (0.29 acres) of permanent impacts to the Santa Maria River from pier and abutment extensions. A maximum of 660,816 sf (15.17 acres) of temporary impacts will occur from construction activity.
Contact Information
Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
State Route 135/101/166
Zip
93401
State Highways
135/101/166
Waterways
Santa Maria River
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.