Wilson / Orange Mixed Use Project
4 Documents in Project
Summary
SCH Number
2006061129
Lead Agency
Glendale Redevelopment Agency
Document Title
Wilson / Orange Mixed Use Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2007
Present Land Use
The current Glendale General Plan land use designation and zoning designation for the project site is Downtown Specific Plan (DSP).
Document Description
The Orange/Wilson Mixed Use project would consist of two 12-story residential buildings containing 196 units on top of four levels of aboveground parking, and up to three levels of belowground parking for a total of 16 stories. The project would also contain approximately 2,250 square feet of retail/commercial space and 5 live/work units accessible via the ground floors. The two buildings would be connected with a pedestrian access bridge at the roof terrace level. In total, the proposed buildings would reach a height of 174 feet and up to 200 feet to the roof of the mechanical penthouse. Project development would require the demolition and removal of one building located on the northeast corner of the site. The project is anticipated to be ready for occupancy in 2010.
Contact Information
Name
Mark Berry
Agency Name
Glendale Redevelopment Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Glendale
Counties
Los Angeles
Cross Streets
Wilson Avenue and Orange Street
Total Acres
1
State Highways
2, 134, I-5
Schools
Edison, Columbus
Waterways
Los Angeles River
Notice of Determination
Approving Agency
City of Glendale
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.