Coleman Creek Storm Drain Improvements

2 Documents in Project

Summary

SCH Number
2006052073
Lead Agency
City of Rohnert Park
Document Title
Coleman Creek Storm Drain Improvements
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2006
Present Land Use
Z: Open Space- Environmental Conservation GP: Parks
Document Description
Extension of an existing 48-inch storm drain so that is discharges approximately 700 feet further downstream in Coleman Creek. The storm drain would be extended from the present discharge point under the existing bike path to the new discharge point. The existing storm drain outfall would be abandoned in place. The new storm drain outfall will include a concrete apron approximately 5-feet by 10-feet on the stream bank and rock slope protection covering about 200 square feet on the lower stream bank and channel bottom to prevent erosion. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0425-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, City of Rohnert Park.

Contact Information

Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Rohnert Park
Counties
Sonoma
Cross Streets
Golf Course Drive and Gavin Way (southwest corner of Golis Park)
Zip
94928
Parcel #
various
State Highways
US 101
Schools
Gold Ridge Elem
Waterways
Coleman Creek
Township
6n
Range
7w
Base
MDBM

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print