Adobe Creek Channel Maintenance Project
3 Documents in Project
Summary
SCH Number
2006042167
Lead Agency
Southern Sonoma County Resource Conservation District
Document Title
Adobe Creek Channel Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2006
Present Land Use
GP: Urban Residential, Rural Residential
Z: C-1 - General Commercial, R-1 - Urban Residential and RR - Rural Residential, Floodway/overlay
Document Description
Flood channel maintenance along Adobe Creek in Petaluma. Work in the Sartori Reach will include demolition of an existing grouted rock check structure and replacement with a rock step pool structure; installation of planted rock rip-rap for bank stabilization at a slip-out along about 40 feet of stream frontage; excavation of about 700 cubic yards of accumulated; and vegetation management throughout the reach. Vegetation management will include selective removal, thinning, and pruning of vegetation within the stream channel, and will focus on invasives such as blackberry and on trees, primarily arroyo willow, growing in the channel bottom and blocking the flow. A goal of vegetation management will be encourage the development of overstory vegetation to shade the stream. Work in the McDowell Reach primarily involves removal of sediment from the existing sediment detention basin near the McDowell Boulevard Bridge in an area approximately 250 feet long and 80 feet wide. Work will be done with a long-reach excavator operating from the top of bank. Vegetation management along the entire McDowell Reach will be as described for the Sartori Reach. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0331-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Sonoma County Water Agency.
Contact Information
Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Petaluma
Counties
Sonoma
Cross Streets
Creek intersects Sartori Drive, McDowell Blvd., Lakeville Highway
Zip
94954
Parcel #
Various
State Highways
US 101
Schools
Casa Grande HS
Waterways
Petaluma River
Township
5N
Range
7W
Base
MD
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.