Addendum to the Mitigated Negative Declaration for the Wastewater Treatment Plan Upgrade Project at California State Prison at Centinela

3 Documents in Project

Summary

SCH Number
2006031113
Lead Agency
California Department of Corrections and Rehabilitation (CDCR)
Document Title
Addendum to the Mitigated Negative Declaration for the Wastewater Treatment Plan Upgrade Project at California State Prison at Centinela
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2007
Present Land Use
Institutional / Special Purpose Facility
Document Description
Pursuant to Section 15164 of the CEQA, CDCR has prepared an Addendum to the Wastewater Treatment Plant Upgrade Project for California State Prison, Centinela Initial Study and Mitigated Negative Declaration because of modifications made to the project that are described in the Addendum. This expansion would include installing larger aerators for pond #1 (from 15 horsepower [HP] to 20 HP), increasing the freeboard along the treatment ponds by approximately 12 inches, expanding the head works capacity to allow for more pumping capacity, and modifying the Report of Waste Discharge to include this expansion in capacity. The modifications do not raise important new issues about the significant impacts on the environment beyond those previously analyzed in the Initial Study/Mitigated Negative Declaration (IS/MND) dated March 27, 2006. Therefore the CDCR can take action on the project as being within the scope of the MND.

Contact Information

Name
Cher Daniels
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
Brown Road / Evan Hewes Highway
Waterways
Dixie Drain C-1
Other Location Info
City/Nearest Community: Dixieland

Notice of Determination

Approving Agency
California Department of Corrections and Rehabilitation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print