Central Avenue Flood Control Improvement Project Consideration of Adoption of a Resolution of Necessity: District 1
5 Documents in Project
Summary
SCH Number
2006031067
Lead Agency
San Diego County
Document Title
Central Avenue Flood Control Improvement Project Consideration of Adoption of a Resolution of Necessity: District 1
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2013
Present Land Use
N/A
Document Description
The proposed project consists of improvements to the Central Avenue Flood Control Facility in two areas to minimize the risk of flooding. At the western area, stormwater collected on Central Avenue would be rerouted to outlet in the channel west of Dawsonia Street, rather than down Hazelhurst Court. The existing Hazelhurt Court storm drain system would then only carry local water to outlet in the channel. At the eastern area, the existing floodwall would be extended and sealed. Other minor associated improvements include construction of a J-wall in the channel, replacement of existing flap-gates to improve function, and construction of a larger inlet near the flood wall.
Contact Information
Name
Steve Ron
Agency Name
County of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Regions
Unincorporated
Cross Streets
Central Avenue between Dawsonia and Belle Bonnie Brae
Zip
91902
Total Acres
5
Parcel #
Various
State Highways
I-805
Schools
Sunnyside Elementary
Waterways
Sweetwater River
Township
17S
Range
1W
Base
Nation
Other Location Info
Bonita
Notice of Determination
Approving Agency
County of San Diego Flood Control District Board of Directors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A