Manabe Wetland Restoration Project

3 Documents in Project

Summary

SCH Number
2006022116
Lead Agency
City of Watsonville
Document Title
Manabe Wetland Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2011
Present Land Use
Public Lands, Agriculture
Document Description
The Project consists of Phase 2 activities of the Manabe Property Wetland Restoration Project which includes widening the section of the Watsonville Slough channel between Highway 1 and Ohlone Parkway to accommodate additional freshwater marsh and riparian woodland habitat by grading and re-contouring the agricultural row crop land. The main ditch line of Watsonville slough will be widened and the flow will be diverted through gravity culverts or screened pumps and pipes to avoid contact with active grading. Hydroseed will be installed following grading. A trail system would be constructed to provide pedestrian and bicycle access around the perimeter of the site. The trails would be approximately six feet wide and the sides of the trails will be re-vegetated with native vegetation. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0365-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, City of Watsonville.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Between Hwy. 1 and Kearney Road
Zip
95076
Total Acres
25
Parcel #
052-104-36
State Highways
1, 129
Airports
Watsonville
Waterways
Pajaro River, Watsonville Slough

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print