McLaughlin Reservoir Project

5 Documents in Project

Summary

SCH Number
2006021015
Lead Agency
Eastern Municipal Water District
Document Title
McLaughlin Reservoir Project
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2006
Present Land Use
Zoning- SP/ General Plan Designation- open space
Document Description
The proposed McLaughlin Reservoir Project (project) would consist of the costruction of a 4.3 million gallon water storage reservoir, pump station, and associated pipelines, access road, and tie-ins. The proposed project is required within the Ellis Pressure Zone for providing water for the previously approved Menifee Valley Ranch development. The purpose/objectives of the proposed project would be to provide adequate fire flow for fire hydrants, provide adequate capacity to meet the established maximum day demand that would, for example, occur during the hottest summer day, and to provide adequate emergency capacity should electric power be interrupted. The existing water storage capacity and distribution system within the Ellis Pressure Zone does not have the capacity to meet the above provisions for the proposed development in the surrounding area.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Regions
Unincorporated
Zip
92585
Parcel #
various
State Highways
74
Railways
BNSF
Township
58
Range
3W, 2W
Section
13, 18
Base
SBBM
Other Location Info
Romoland

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print