Periodic Shutdown and Maintenance of the San Diego Pipeline Nos. 3, 4, and 5

Summary

SCH Number
2006018360
Public Agency
Metropolitan Water District of Southern California
Document Title
Periodic Shutdown and Maintenance of the San Diego Pipeline Nos. 3, 4, and 5
Document Type
NOE - Notice of Exemption
Received
Posted
1/27/2006
Document Description
The Metropolitan Water District of Southern California proposes to periodically shutdown and perform maintenance on the San Diego Pipeline Nos. 3, 4, and 5. Metropolitan proposes to dewater the pipelines at several locations along the San Diego Pipeline Nos. 3, 4, and 5; perform inspections of the San Diego Pipeline Nos. 3, 4, and 5, Lake Skinner Outlet Conduit, and East Lake Skinner Bypass; make minor repairs to portions of the pipelines; repair and replace small equipment, such as valves within the pipelines; and as necessary, perform road maintenance to allow access to the pipelines and equipment.

Contact Information

Name
Jennifer Harriger
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Regions
Unincorporated

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301, 02, 04, 09
Reasons for Exemption
The project consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving no expansion of use beyond that existing at the time of the lead agency's determination. The project also consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. The project also consists of the minor alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees. The project also consists of activities limited to inspections, to check for performance of an operation, or quality, health, or safety of a project.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print