Recycled Water Dechlorination Facilities
3 Documents in Project
Summary
SCH Number
2006011092
Lead Agency
Eastern Municipal Water District
Document Title
Recycled Water Dechlorination Facilities
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2006
Present Land Use
Commercial Retail, Public Facility, Limited Industrial
Document Description
Eastern Municipal Water District is currently operating temporary sodium bisulfite systems to dechlorinate recycled water prior to discharging into Temescal Wash/Alberhill Creek. These existing temporary facilities were installed on an as-needed basis and are in need of operational and safety improvements. Also, they are not sized to handle the increasing recycled water flows. In order to reduce health and safety risks to the operators, optimize the dechlorination system, provide protection to the aquatic species in Temescal Wash/Alberhill Creek, and standardize the design, construction, equipment selection, and operation and maintenance, EMWD proposes to install permanent facilities at three project sites that would be safer and easier to operate than the existing dechlorinating facilities.
The proposed project would consist of the construction of permanent dechlorination facilities at the Palomar Recycled Water Pump Station, the Reach 4 Recycled Water Pump Station, and the Reach 4 Energy Dissipation Facility. The new systems to be installed at each site would include a number of features to limit risk including containment areas, double walled storage tanks, redundancy, and the use of sodium bisulfite (a low risk chemical), pumps, analyzers, an uninterruptible power supply, and control panels. The existing facilities would be removed at the Palomar and Reach 4 Recycled Water Pump Stations.
Contact Information
Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lake Elsinore, Wildomar
Counties
Riverside
Cross Streets
Various
Zip
92530, 86,
Parcel #
Various
State Highways
I-15
Schools
Lake Elsinore USD
Waterways
Salt Creek, Temescal Wash, Alberhill, Creek
Other Location Info
City/Nearest Community: Sun City
Other Information
Zip Code: 92595
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No