Well Test and Development Program Project

4 Documents in Project

Summary

SCH Number
2006011023
Lead Agency
Idyllwild Water District
Document Title
Well Test and Development Program Project
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2006
Present Land Use
Open Space
Document Description
Recent drought conditions in the Idyllwild area have reduce the Idyllwild Water District's well production such that the District has determined it is necessary to located additional well sites to maintain adequate public water supplies. To identify locations for new wells that have the greatest potential to produce significant quantities of water without interfering with existing wells, the District evaluated geologic literature and the mapping of sedimentary materials in the area. The District also had an electro-seismic survey, or National Water Survey (NWS), conducted at each test well site. Based on the data obtained from the field NWS and the literature review, including geologic comparisons and the known yield of existing wells, two test well sites were selected. The proposed project is the drilling of two test wells, at two separate locations, in Idyllwild to evaluate the potential water production capacity at each site. The test well locations have been selected based upon water bearing potential and permission to drill on the property only. The results of the test wells will be used in the consideration of future water production wells that would be evaluated as a discrete or separate action under CEQA.

Contact Information

Name
Terry Lyons
Agency Name
Idyllwild Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
State Highways
243
Township
5S
Range
2E, 3E
Section
7, 12
Other Location Info
City/Community: Idyllwild

Notice of Determination

Approving Agency
Idyllwild Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print