R Street Combined Sewer Storage - 11th to 13th Street (XN27)
Summary
SCH Number
2005128112
Public Agency
Capitol Area Development Authority
(CADA)
Document Title
R Street Combined Sewer Storage - 11th to 13th Street (XN27)
Document Type
NOE - Notice of Exemption
Received
Posted
12/14/2005
Document Description
This project consists of the construction and placement of 1600 linear feet of 12-inch water main and 6 fire hydrants in R Street between 10th and 13th Street, 800 linear feet of 42-inch combined sewer main in R Street between 11th and 13th Street and 420 linear feet of 42-inch combined sewer main in 12th Street between R Street and S Street and 420 linear feet of 24-inch combined sewer main in 11th Street between R Street and S Street. Replacement of 18 existing drain inlets with modified Type B or No. 22 drain inlets and leads. Removal of 16 manholes, and construct 8 No. 4 manholes. Live sewer services will be replaced and abandoned sewer services will be plugged. The Capitol Area Development Authority Board is authorizing a use of funds to partially pay for the project. The City of Sacramento is partially funding and fully constructing the project.
Contact Information
Name
Todd Leon
Agency Name
Capitol Area Development Authority
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Section 15302(c), 15303(d)
Reasons for Exemption
15302(c) Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity; 15303(d) New construction of water main or utility extensions of reasonable length to serve such construction.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.