Motel Inn Siphon
3 Documents in Project
Summary
SCH Number
2005121165
Lead Agency
City of San Luis Obispo
Document Title
Motel Inn Siphon
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2006
Present Land Use
Spans three zinesl C-T-S, C/OS-5, & R-1
Document Description
The project involves replacing an existing siphon that crosses San Luis Obispo Creek near the northern city limits, behind the Motel Inn, and crossing to San Luis Drive near Corralitos. The replacement siphon, consisting of two, 8-inch pipes, will be placed slightly deeper than the existing pipe, approximately 5 feet from the current location. The work would include bank protection on the outside of the curve of the creek at this point to protect the new siphon from the erosion that has exposed the current pipe. Bank stabilization will be accomplished with a combination of hardscape and biotechnical techniques. Due to the constrained nature of the site, mitigation proposed to offset temporary project impacts will be carried out at a nearby site.
Contact Information
Name
Jaime Hill
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Luis Obispo
Counties
San Luis Obispo
Zip
93401
Railways
UPRR
Schools
San Luis High School
Waterways
San Luis Obispo Creek
Base
Mtdiablo
Notice of Determination
Approving Agency
Community Development Director
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.