New High School in the City of Yorba Linda
3 Documents in Project
Summary
SCH Number
2005121121
Lead Agency
Placentia-Yorba Linda Unified School District
Document Title
New High School in the City of Yorba Linda
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2006
Present Land Use
General Plan: Medium Density Residential
Zoning: Planned Community (PC)
Document Description
The proposed comprehensive high school would provide seats for a maximum of 1,800 students in grades 9 through 12, and a 4,500 spectator football stadium in the City of Yorba Linda. The new facilities will include classroom buildings, an administrative building, a library, a media center, a cafeteria, a gymnasium, a performing art center, a lighted 4,500-spectator capacity football stadium, a swimming pool, turf and paved athletic fields, and approximately 900 parking spaces, on an approximately 66-acre site. Existing structures from the Continuing Education Center campus would be renovated to accommodate high school students.
Contact Information
Name
Mike Bailey
Agency Name
Placentia-Yorba Linda Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Yorba Linda
Counties
Orange
Cross Streets
Fairmont Boulevard and Bastanchury Road
Zip
92670
Total Acres
66.2
State Highways
SR-90
Notice of Determination
Approving Agency
Placentia-Yorba Linda Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.